I. Current Problem Diagnosis: On-site inspection and load measurement confirmed that the outgoing circuits of the project’s existing low-voltage distribution cabinet (No. XXX) were fully occupied, with a load factor exceeding 85% for a prolonged period, and nearing full load during peak periods. The existing cabinet structure and busbar capacity were unable to meet the power demands of the newly added equipment, posing a serious overload risk and hindering further project development.XINENG’S Solution: Adding a new distribution cabinet to expand the system To resolve the above bottleneck, this solution adopts the core strategy of “adding a new low-voltage distribution cabinet of the same capacity and integrating it with the original distribution system to expand the capacityBenefits to customer:Implementation Benefits After the expansion is completed, the total capacity of the system will increase by approximately 100%, and the load rate will be safely controlled at a standard level below 60%, providing solid and safe power guarantee for the project’s future equipment capacity expansion and power needs.

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *

CONTACTA CON NOSOTROS

Escríbenos un mensaje