power distribution solution

mandy@xnelectric.com

+86 17337927208

+86 13721603062

I. Current Problem Diagnosis: On-site inspection and load measurement confirmed that the outgoing circuits of the project’s existing low-voltage distribution cabinet (No. XXX) were fully occupied, with a load factor exceeding 85% for a prolonged period, and nearing full load during peak periods. The existing cabinet structure and busbar capacity were unable to meet the power demands of the newly added equipment, posing a serious overload risk and hindering further project development.XINENG’S Solution: Adding a new distribution cabinet to expand the system To resolve the above bottleneck, this solution adopts the core strategy of “adding a new low-voltage distribution cabinet of the same capacity and integrating it with the original distribution system to expand the capacityBenefits to customer:Implementation Benefits After the expansion is completed, the total capacity of the system will increase by approximately 100%, and the load rate will be safely controlled at a standard level below 60%, providing solid and safe power guarantee for the project’s future equipment capacity expansion and power needs.

Leave a Reply

Your email address will not be published. Required fields are marked *

CONTACT WITH US

Write us a message